Diamond Systems Tritan Guia de Resolução de Problemas Página 41

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 40
41
PRETRIAL PREPARATION
Company______________________ Date Sch.____________ Material ____________________
Location______________________ Time Sch.____________ Pounds ____________________
Part______________________ Received?____________________
Trial Objectives (short demo, fast cycle, production run, etc.) __________________________________
Technical contact/phone _______________________________________________________________
DRYER
Desiccant Dryer ________ , Capacity ______________ lb, Temp _________ °C/°F, Time ________
PART AND SHOT (Part available to send in will eliminate several following items.)
Part Weight ______________
Specic Gravity ______________
Flow Length from gate ______________
Wall Thickness(es) ______________
Gate Size ______________
Number of Cavities ______________
Shot weight ______________ ounces
Part Projected Area ______________ sq. inches
MOLDING MACHINE
Molding machine capacity ______________ ounces
Machine clamp ______________ tons
Inject speed prole ability ______________
Mold cooling available ______________
Check valve & Screw type ____________________________________________________
Hot-runner system/type ____________________________________________________
OTHER INFORMATION
Form 1
Vista de página 40
1 2 ... 36 37 38 39 40 41 42 43 44

Comentários a estes Manuais

Sem comentários